Get involved in YOUR city and locality - Improve Your World
Get involved in YOUR city and locality - Improve Your World
english Translate Karmayog.org in German Translate Karmayog.org in Japanese Translate Karmayog.org in Korean Translate Karmayog.org in French Italian Translate Karmayog.org in Portuguese Translate Karmayog.org in Spanish Translate Karmayog.org in Chinese Translate Karmayog.org in Dutch Translate Karmayog.org in Greek  
 Get involved in YOUR city and locality 
Improve Your World Home | In Hindi | About Us | Donate | Sitemap | Search | Contact Us 
Home >> Rain Water Harvesting - Urban >> Delhi
Also see : Rain Water Harvesting - Rural, Water
Please help us in making this a comprehensive resource section for those directly connected or affected by this issue e.g. citizens, NGOs, government officers, students, teachers, researchers. Please directly upload or email us relevant content. This can include lists, articles, photographs, research papers, links to websites, etc. Please volunteer as an expert panelist to whom we can direct queries from our website visitors.

Findstone.com - Marlet Place for Building Stones

HERO HONDA MOTORS RAINWATER HARVESTING SYSTEM

Click to enlarge
RAINWATER AVAILABLE FOR HARVESTING

Total rooftop area:
11,080 square metres (sq m)Av

erage annual rainfall in Gurgaon:4
577.8 millimetres (mm)

Total rainwater available from rainfall: 5,441 metre cubic (m 3 ) or 54,41,720 litres (Which is 85 per cent of total rainwater harvesting potential of these buildings.)

WATER SUPPLY SOURCE
The water requirements for potable and non potable purposes are met by four
bore wells located in the factory premises.

RAINWATER HARVESTING SYSTEM

PHASE-I
The rooftop rainwater from the Administrative building, the New Time Office, the Dispensary, the Canteen, the R & D Centre and the Export & Dispatch buildings is collected by a series of collection chambers and interconnecting pipes. This water is diverted to recharge wells constructed at six different locations in the factory premise. The recharge wells are of the size of 3 m x 2 m x 3 m and are provided with recharge bore wells of 8 inch diameter and 40 m depth. The recharge wells are filled with three layers of pebbles ranging from 10 mm to 100 mm in size, which ensure efficient filteration. The implementation of phase-I was completed in June 2002.

PHASE-II
The rooftop rainwater from the remaning part of the R & D Centre, the Canteen building, the Newly Constructed Gears & Shaft section and the New Alluminium Phase is also collected in collection chambers and through interconnecting pipes diverted to recharge wells at four different ocations. The design and dimensions of the recharge wells remain the same as in phase-I.

The implementation of phase-II was completed in February 2004. The groundwater level, as in February 2004, was around 17 m below ground level (bgl).

The total cost incurred: Rs 12 lakhs



Results of monitroing
Water level 2006  
Water level 2005
Water level 2004




Water level 2006


 


Water Level 2005
water level trends

 

Water Quality 2005
 


 






 
Water Level 2004

Water Level Trends At Hero Honda Motors


 

Water Quality 2004
 
 

 
 


For Details:
Rakesh Goyal
Manager, Safety and Environment,
69th KM stone, Delhi Jaipur
Highway,
Daruhera-122100
Distt Rewari, Haryana
Ph-01274-242131-135, 243292-95, Mob:9911440453
Email: rkgoyal@herohonda.com
 
source: http://www.rainwaterharvesting.org/Urban/hero-honda.htm

Last Updated On : Feb 09, 2010

Your Email :


Also see : Rain Water Harvesting - Rural, Water