Rainwater Harvesting Scenario in Bangalore
SOURCES OF WATER: Surface water:
Source: 1. 2. A conceptual frame for rainwater harvesting in Bangalore, STEM, 2001 3. Vishwanath. S, 2000, Personal Communication To meet the demand supply gap, the government has already proposed to extract 770.0 MLD of water from the Cauvery river under Cauvery stage IV project (Phase I and Phase II). The production cost of this water per kilolitre is expected to be Rs. 45.70. (On completion of these phases total extraction from the Cauvery for Bangalore alone would be 1310 MLD i.e. 478 billion litres in a year or 16.78 thousand million cubic feet [TMC]) Ground water extraction: According to a study conducted by the Centre for Symbiosis of Technology, Environment and Management (STEM), a Bangalore-based research group, the demand supply gap is met by groundwater exploitation. It is estimated that 40 per cent of the population of Bangalore is dependent on groundwater. source: http://www.rainwaterharvesting.org/Crisis/Urbanwater-scenario.htm |