Get involved in YOUR city and locality - Improve Your World
Get involved in YOUR city and locality - Improve Your World
english Translate Karmayog.org in German Translate Karmayog.org in Japanese Translate Karmayog.org in Korean Translate Karmayog.org in French Italian Translate Karmayog.org in Portuguese Translate Karmayog.org in Spanish Translate Karmayog.org in Chinese Translate Karmayog.org in Dutch Translate Karmayog.org in Greek  
 Get involved in YOUR city and locality 
Improve Your World Home | In Hindi | About Us | Donate | Sitemap | Search | Contact Us 
Home >> Rain Water Harvesting - Urban >> Bangalore
Also see : Rain Water Harvesting - Rural, Water
Please help us in making this a comprehensive resource section for those directly connected or affected by this issue e.g. citizens, NGOs, government officers, students, teachers, researchers. Please directly upload or email us relevant content. This can include lists, articles, photographs, research papers, links to websites, etc. Please volunteer as an expert panelist to whom we can direct queries from our website visitors.

Findstone.com - Marlet Place for Building Stones

 

Rainwater Harvesting Scenario in Bangalore

Bangalore: With a population of 5,686,000, Bangalore is India's fifth largest city. As per the estimates of the Bangalore Water Supply and Sewerage Board (BWSSB), the total demand of water is 840 million litres per day (MLD) (assuming a population of 6 million and a supply rate of 140 litres per capita per day [lpcd]). (The demand works out to be 1200 MLD, at the standard rate of 200 lpcd set by the Bureau of Indian Standards [BIS] for water supply in urban areas). Corresponding demand supply gaps are 135 and 495 MLD.

SOURCES OF WATER:
Surface water:
Source Design capacity
(MLD)
Present withdrawl
(MLD)3
1.Arkavathy river
a) Hesarghatta
b) T.G.Hally

36
148

6.0
36.0
2.Cauvery river
a) Stage-I
b) Stage-II
c) Stage-III

135
135
270

135
135
270
  724 582

Source:
1. http://www.bwssb.org/my_html/nodal_info.html
2. A conceptual frame for rainwater harvesting in Bangalore, STEM, 2001
3. Vishwanath. S, 2000, Personal Communication

To meet the demand supply gap, the government has already proposed to extract 770.0 MLD of water from the Cauvery river under Cauvery stage IV project (Phase I and Phase II). The production cost of this water per kilolitre is expected to be Rs. 45.70. (On completion of these phases total extraction from the Cauvery for Bangalore alone would be 1310 MLD i.e. 478 billion litres in a year or 16.78 thousand million cubic feet [TMC])

Ground water extraction: According to a study conducted by the Centre for Symbiosis of Technology, Environment and Management (STEM), a Bangalore-based research group, the demand supply gap is met by groundwater exploitation. It is estimated that 40 per cent of the population of Bangalore is dependent on groundwater.

source: http://www.rainwaterharvesting.org/Crisis/Urbanwater-scenario.htm


Your Email :


Also see : Rain Water Harvesting - Rural, Water